No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
<center><h1>Engineering</h1></center> | <center><h1>Engineering</h1></center> | ||
__NOTOC__ | __NOTOC__ | ||
==Engineering== | |||
===Construction / Repairs=== | |||
''<small>This section is incomplete. Assign Central Command intern to complete this section at a later date.</small>'' | |||
===Obtaining a Permit for Renovation=== | |||
*Should the desire arise to alter or upgrade parts of the station permanently, a permit must be requested from Central Command for construction. | |||
*A blueprint should be submitted, mapping the area as it is, and then an additional blueprint displaying what changes are to be made. | |||
*When the blueprint and permit is approved, you will be contacted by a Central Command representative. | |||
(( Construction Permits are just the in-character way of doing changes to the station. For changes to actually be permanent, consult the [[Guide to Mapping]] and submit changes to the GIT.)) | |||
===Shields=== | |||
*Unless circumstances such as a meteor shower require it, hull shields and bubble shields should not be activated where they block access to station facilities, including external airlocks, docking ports, mass drivers or disposals/vents to space such as those in virology and xenobiology. | |||
*Full-station hull shields or other precautionary measures may be installed ahead of time provided they are not activated. | |||
*Local protective shielding for specific areas may be deployed freely where they do not impede station operations. | |||
===Fire and Environmental Hazards=== | |||
*Immediate evacuation of all untrained personnel. | |||
*Fire alarms to be used to control hazard. | |||
*[[Atmospheric Technician]]s and [[Engineer]]s are to remove hazard. | |||
===Meteor Storm=== | |||
*All crew to move to central parts of the station. | |||
*Damage is to be repaired by [[Atmospheric Technician]]s and [[Engineer]]s after the threat has passed. | |||
===Singularity Containment Failure=== | |||
*Observation of Singularity movement. | |||
*Evacuation to be called if deemed a major threat to station integrity. | |||
*Demotion of [[Chief Engineer]] and repair of Engine if no threat manifests. | |||
===Supermatter Meltdown Imminent=== | |||
*Eject the Core. | |||
*Chief Engineer has to submit an incident report to [[Internal Affairs]]. | |||
===Supermatter Meltdown=== | |||
*Evacuate engineering and inform the CMO. | |||
*Set up secondary power sources such as the solar arrays or the singularity if available. | |||
*Demotion of Chief Engineer and repair of Engineering department. |
Revision as of 13:54, 24 October 2022
Engineering
Engineering
Construction / Repairs
This section is incomplete. Assign Central Command intern to complete this section at a later date.
Obtaining a Permit for Renovation
- Should the desire arise to alter or upgrade parts of the station permanently, a permit must be requested from Central Command for construction.
- A blueprint should be submitted, mapping the area as it is, and then an additional blueprint displaying what changes are to be made.
- When the blueprint and permit is approved, you will be contacted by a Central Command representative.
(( Construction Permits are just the in-character way of doing changes to the station. For changes to actually be permanent, consult the Guide to Mapping and submit changes to the GIT.))
Shields
- Unless circumstances such as a meteor shower require it, hull shields and bubble shields should not be activated where they block access to station facilities, including external airlocks, docking ports, mass drivers or disposals/vents to space such as those in virology and xenobiology.
- Full-station hull shields or other precautionary measures may be installed ahead of time provided they are not activated.
- Local protective shielding for specific areas may be deployed freely where they do not impede station operations.
Fire and Environmental Hazards
- Immediate evacuation of all untrained personnel.
- Fire alarms to be used to control hazard.
- Atmospheric Technicians and Engineers are to remove hazard.
Meteor Storm
- All crew to move to central parts of the station.
- Damage is to be repaired by Atmospheric Technicians and Engineers after the threat has passed.
Singularity Containment Failure
- Observation of Singularity movement.
- Evacuation to be called if deemed a major threat to station integrity.
- Demotion of Chief Engineer and repair of Engine if no threat manifests.
Supermatter Meltdown Imminent
- Eject the Core.
- Chief Engineer has to submit an incident report to Internal Affairs.
Supermatter Meltdown
- Evacuate engineering and inform the CMO.
- Set up secondary power sources such as the solar arrays or the singularity if available.
- Demotion of Chief Engineer and repair of Engineering department.