SoP: Engineering
Duties
Dress Code & Presentation
Construction & Repair
This section is incomplete. Assign Central Command intern to complete this section at a later date.
Permits & Renovations
- Should the desire arise to alter or upgrade parts of the station permanently, a permit must be requested from Central Command for construction.
- A blueprint should be submitted, mapping the area as it is, and then an additional blueprint displaying what changes are to be made.
- When the blueprint and permit is approved, you will be contacted by a Central Command representative.
(( Construction Permits are just the in-character way of doing changes to the station. For changes to actually be permanent, consult the Guide to Mapping and submit changes to the GIT.))
Shields
- Unless circumstances such as a meteor shower require it, hull shields and bubble shields should not be activated where they block access to station facilities, including external airlocks, docking ports, mass drivers or disposals/vents to space such as those in virology and xenobiology.
- Full-station hull shields or other precautionary measures may be installed ahead of time provided they are not activated.
- Local protective shielding for specific areas may be deployed freely where they do not impede station operations.
Emergency Procedures
See SoP:Alert Levels